Saturday, April 21, 2012

Day 6 and 7 (18-19.04.2012) - Site Updates

Construction manager gave me a call on Day 6. No site supervisor yet.
By Day 7, we got the temporary timber crossover and sediment control barrier to the front of site. The electrical connection that was relocated to the side of garage is also ready.